Posted:
August 24, 2020
Completion of deliverable D2.2
On 30-4-2020 the completion of the deliverable D2.2 was carried out: “Protocol of electrochemical detection of bacterial DNA on GO surface”
On 30-4-2020 the completion of the deliverable D2.2 was carried out: “Protocol of electrochemical detection of bacterial DNA on GO surface”