Posted:
June 21, 2021
Completion of deliverable D3.4.1
On 30-11-2020, the deliverable D3.4.1 «Mechanical design of PoC instrument» (Μ28) was completed.
On 30-11-2020, the deliverable D3.4.1 «Mechanical design of PoC instrument» (Μ28) was completed.